Dual track competition system, multiple difficult competition questions,
The top judges have strong endorsements, heavy bonuses and resource support. The competition now publishes "Hero Posts" for high-end intelligent AI algorithm talents (teams) inside and outside the Southern Power Network system!
We warmly invite individuals, maker teams, companies, universities, etc. with ideas, skills, and abilities to sign up and participate!
Recruitment direction
Focusing on a total of 24 typical algorithm scenarios in "power transformation specialty" and "power transmission specialty", an algorithm competition for image recognition model of typical defects in power transmission and transformation equipment was conducted.
Professional substation track
01 Substation equipment inspection category:
● Casing porcelain bottle/support porcelain bottle is damaged
● Equipment metal is severely corroded
● Oil leakage from main transformer-oil pollution on the component surface and oil pollution on the ground
● The main transformer respirator is damaged and silicone color changes
● GIS switch switch opening and closing indication status
02 Substation facilities environment category:
● Foreign objects-floating objects
● Foreign objects-Bird's Nest
● Small animals break in
● The door and box door are closed abnormally
● Fire smoke
03 Safety category for substation operations:
● Personnel do not wear helmets/do not wear tooling/smoke
● Personnel climbing
Power transmission professional track
01 Transmission equipment category:
● Glass insulators self-destruct
● Composite insulator skirt is damaged
● Composite insulators heat
● Metal fittings rust
● Pin is missing or withdrawn
● Bird's Nest
● Pressure grading ring tilted
● Floating objects (kites, plastic films, etc.)
● Cable cover is missing or damaged
02 Transmission equipment environmental category:
● Mountain fires
● Smoke (overhead line channel + cable tunnel channel)
03 Security Category:
● Identification of personnel on the tower
Registration notice
Registration time
17:00 on March 15, 2023 to 24:00 on March 31, 2023
Registration method
Using the online registration method, participating individuals (teams) need to fill in the registration information form, business plan and entry declaration (see scanning the code at the end of the article to download the registration information), and send it to the email nwsgkc@163.com for registration.
Registration conditions
01 The participating projects have independent intellectual property rights and have no ownership disputes or commercial law disputes;
02 The participating projects have practical adaptability and can be applied to the Production Command Center of Shenzhen Power Supply Bureau for effective defect identification;
03 The same person can only join 1 team, and the number of participants in each team will not exceed 5. Participating teams can sign up for both power transformation and power transmission tracks at the same time;
04 The participating teams agreed to deploy the algorithm to Shenzhen Power Supply Bureau for free demonstration application after the game for a period of one year.
event process
This competition is divided into four stages: registration, preliminary competition, rehearsal and algorithm deployment, semi-competition and award awarding:
Registration period March 15-March 31
Preliminary stage April 3-April 4
Preview and algorithm deployment phase April 6-April 12
Rematch and award stage April 14-April 18
Each track will have comprehensive first, second and third prizes. Set an excellent algorithm award for each algorithm scenario
Comprehensive awards/individual winning awards for the same track will not be repeated
Dual track cash rewards can be earned repeatedly
In addition to generous bonuses, we can also realize the introduction of strong service resources and obtain power system application implementation opportunities. Priority will be given to incubation and cultivation in the Shenzhen and Hong Kong Science and Technology Innovation Company of the Southern Power Grid.
Enjoy more service support!