image
Application for Pudong energy-saving and low-carbon funds
Application period for special funds for energy-saving and low-carbon initiatives in Pudong New Area’s commercial sector has started
(GMT+8:00) Beijing, Chongqing, Hong Kong SAR, Urumqi
Program type
Project funding
Event
Organizer
Funding3000000 - 5000000 CNY
Solution maturityLow - Low-medium
Program details

To further strengthen support for energy conservation and low-carbon initiatives in the commercial sector of Pudong New Area, applications for the 2023 Special Fund Project for Energy Conservation and Low-Carbon Initiatives in the Commercial Sector of Pudong New Area are now being accepted.

Eligible Applicants

  1. Legal entities and unincorporated organizations established in Pudong New Area in accordance with the law, with normal operating status and good credit records;
  2. Project implementation units that carry out projects in Pudong New Area aimed at reducing energy consumption or carbon emissions in the area and improving energy efficiency.

Scope of Support and Standards

Energy-saving Technology TransformationSubsidies are provided for fixed-asset investment projects that achieve significant results through technology transformation and upgrading, and have certain significance for promotion. For projects listed as municipal-level energy-saving transformation projects, the new district offers matching support at a 1:1 ratio according to the city’s relevant subsidy measures, with the total subsidy amount from both the urban and district levels not exceeding the total project investment. For projects listed as district-level energy-saving transformation projects, applicants whose annual energy savings after implementation reach 20 tons of standard coal or more, upon verification by professional departments, will receive a subsidy of 1,000 yuan per ton of standard coal based on the annual savings, with the total subsidy for a single project not exceeding 3 million yuan. Entities that have already applied for special funding for demonstration projects are not eligible for this subsidy policy.

Energy Efficiency Benchmarking ManagementA one-time subsidy of 150,000 yuan is provided to energy-consuming enterprises that have achieved advanced levels in energy efficiency benchmarking management, in accordance with the “Guidelines for Rational Energy Use in Large Commercial Buildings in Shanghai” (DB31/T552-2017), as an incentive for their active participation in energy conservation and emission reduction efforts and the significant results they have achieved. The subsidy policy for energy efficiency benchmarking management is structured on a five-year cycle, with each commercial entity eligible to receive it once per cycle.

Advanced in Energy Conservation and Low CarbonCommercial premises that are recognized as “Energy Efficiency Pioneers” in Shanghai or win other municipal-level or higher awards for advanced commercial energy conservation and low carbon initiatives will receive a one-time reward of 150,000 yuan.

Creation of Green Shopping MallsA one-time reward of 200,000 yuan will be given to large shopping malls operating within this area that successfully become national green shopping mall recognized by the Ministry of Commerce.

Establishment of Green RestaurantsA one-time reward of 100,000 yuan will be provided to catering businesses operating in this area that successfully become model units of green restaurants in Shanghai.

Application Requirements and Materials

1 Energy-saving Technology Transformation Project

reporting conditions Projects listed at the municipal or district level for energy-saving technology transformation that were completed by May 8, 2022, and December 31, 2022, have obtained the completion acceptance report, been in trial use for three months. application materials

  1. Application Report for Subsidies for Energy-saving Technology Transformation Projects of Commercial Enterprises in Pudong New Area and its attached forms;
  2. Business license of the enterprise; Purchase contracts, payment vouchers, etc., for energy-saving technology renovation projects; Acceptance report for energy-saving technology renovation projects (joint acceptance by both parties); Renovation plan including design drawings and performance parameter documents of new equipment (materials); Evidence of system operation time before and after the renovation;
  3. Materials on energy statistics and analysis before and after the renovation;
  4. Other materials required to be submitted.

2 Energy Efficiency Benchmarking Management Project

reporting conditions From May 8, 2022, to December 31, 2022, the enterprise’s energy consumption indicators must reach the advanced values specified in the “Guidelines for Rational Energy Use in Large Commercial Buildings in Shanghai” DB31/T552-2017.

application materials

  1. “Application Report for Subsidies for Energy Efficiency Benchmarking Management of Commercial Enterprises in Pudong New Area” (Appendix 3);
  2. Property ownership certificate or lease agreement;
  3. Monthly bills for various energy consumption costs throughout 2022;
  4. Proof of submitting energy consumption monitoring data for commercial enterprises in Pudong New Area;
  5. Relevant screenshots of continuously uploading sub-metered data to the platform.

3 Advanced Energy-Saving and Low-Carbon Projects

reporting conditions Commercial enterprise operating units that received the “Leader in Energy Efficiency” award in Shanghai or other municipal-level or higher awards for advanced commercial energy-saving and low-carbon projects from July 1, 2022, to June 30, 2023.

application materials

  1. “Application Form for Financial Subsidies for Advanced Energy-Saving and Low-Carbon Projects (Pudong New Area)” (Appendix 4);
  2. Work report (covering practices in project establishment and energy-saving efforts);
  3. Copy of business license;
  4. Commitment letter (stating that all provided materials are true and valid);
  5. Relevant supporting documents (screenshots of online applications and publicized lists).

4 Green Mall Projects

reporting conditions Enterprises that successfully became part of this year’s “National Green Mall Demonstration Project” from July 1, 2022, to June 30, 2023.

application materials

  1. “Application Form for Financial Subsidies for National Green Malls (Pudong New Area)” (Appendix 5);
  2. Work report (covering practices in project establishment and energy-saving efforts);
  3. Copy of business license;
  4. Commitment letter (stating that all provided materials are true and valid);
  5. Relevant supporting documents (screenshots of online applications and publicized lists).

5 Green Restaurant Demonstration Store Projects

reporting conditions Catering enterprises in Pudong New Area that obtained the title of “Shanghai Green Restaurant Demonstration Store” during the establishment (or re-evaluation) of green restaurants from May 8, 2022, to December 31, 2022.

application materials

  1. “Application Form for Financial Subsidies for Shanghai Green Restaurant Demonstration Stores (Pudong New Area)” (Appendix 6);
  2. Work report (covering the restaurant’s practices and achievements in energy-saving efforts);
  3. Copies of business licenses (for the store and the group);
  4. Copies of rental agreements and rent invoices;
  5. Commitment letter (stating that all provided materials are true and valid);
  6. Relevant supporting documents (such as documents granting the title, photo albums, and plaque photos).

Application Requirements and Contact Information

Three copies of the application materials are required, stamped with the official seal of the applying entity, with the submission deadline being August 31, 2023.

1. Energy-saving technology renovation projects, energy efficiency benchmarking management projects, and advanced energy-saving and low-carbon projects

联系人:吴敏 13061611222

2. Green mall and green restaurant demonstration store projects

联系人:金滢 13818619296

3>Market Operations Department, Pudong Business Commission

Contact person: Wu Weiwen, Phone: 28282701

Publisher
TanLIVE
Organizer
Shanghai Pudong New Area Business Commission
Report